SSATP Annual Meeting 2005 -- Planning Retreat Report

The 2005 Annual Meeting of the Sub-Saharan Africa Transport Policy program (SSATP) - to take place in Bamako, Mali, in November 2005 - is a key strategic milestone for the program. The implementation of SSATP's Long-Term Development Plan (LTDP) for 2004-2007 is well underway, but challenges remain in converting policy lessons into practice. SSATP's member countries and partners also face new challenges, such as how to address the Millennium Development Goals (MDGs) and respond to new arrangements for donor funding.

English

The Problems Facing Labor-based Road Programs and What to Do About Them -- Evidence from Ghana

The literature gives two explanations for contractors' reluctance to adopt labor-based methods. First, contractors believe the cost of learning this new technology is high. Programs designed to promote labor-based methods have always included subsidized training to address this problem. This study argues that focusing on training often diverts attention away from more substantive problems inherent in adopting labor-based methods.

English

Les programmes routiers à haute intensité de main-d’oeuvre : problèmes et solutions -- L’expérience du Ghana

The literature gives two explanations for contractors' reluctance to adopt labor-based methods. First, contractors believe the cost of learning this new technology is high. Programs designed to promote labor-based methods have always included subsidized training to address this problem. This study argues that focusing on training often diverts attention away from more substantive problems inherent in adopting labor-based methods.

French

Rural Roads in Sub-Saharan Africa -- Lessons from World Bank Experience

This report, prepared under the Rural Travel and Transport Project of the sub - Saharan Africa Transport Program (SSATP), presents findings from a review of 127 projects with rural road components in SSA. The review highlights key policy changes discussed under the main headings of planning, design and technology, resource mobilization, and sectoral organization and institutional performance. Planning is seen as a process involving key constituencies at various levels rather than a methodology.

English
Keywords: 

Privately Financed Infrastructure -- A Concession Company’s Point of View

Under a concession system the state grants a franchise the right to finance, build, own, operate, and maintain a public infrastructure for a given period, and to charge users for that service. Concessions are normally stand-alone, single-purpose entities that are expected to finance themselves eventually, if not initially, without recourse to their shareholders. They are independent corporate entities run by a dedicated staff that seeks career advancement within the concession company. Invariably, the successful concession has been created because of a compelling economic need.

English
Keywords: 

SSATP Progress Report 2000

The Sub-Saharan Africa Transport Policy Program (SSATP) was launched fifteen years ago as a joint initiative of the World Bank and the United Nations Economic Commission for Africa (UNECA) to improve transport sector performance by promoting policy reforms and institutional changes. The basic premises of the Program are that policy reform is essential in order to improve transport services; and that countries and their development partners need to col-laborate in the sector within a common framework of policies.

English

SSATP Progress Report 1999

The basic premises of the Program are that: (i) policy reform is essential to obtain improved provision of transport services; and (ii) countries and their development partners need to collaborate within the framework of a common vision of policies and strategies in the sector. The SSATP is concentrating on assisting African countries in their efforts to build capacity for designing and implementing these premises. Capacity building is now firmly the focus of the Program.

English